Nsls Ii Injector Commissioning And Initial Operation
Download and Read Nsls Ii Injector Commissioning And Initial Operation full books in PDF, ePUB, and Kindle. Read online free Nsls Ii Injector Commissioning And Initial Operation ebook anywhere anytime directly on your device. We cannot guarantee that every ebooks is available!
NSLS-II Injector Commissioning and Initial Operation*
Author | : |
Publisher | : |
Total Pages | : |
Release | : 2015 |
Genre | : |
ISBN | : |
Download NSLS-II Injector Commissioning and Initial Operation* Book in PDF, Epub and Kindle
The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.
NSLS-II Injector Commissioning and Initial Operation* Related Books
Pages:
Pages:
Pages:
Pages: 892
Pages: 948