CONSTRUCTION DESIGN OF EBR-II

CONSTRUCTION DESIGN OF EBR-II
Author:
Publisher:
Total Pages:
Release: 1958
Genre:
ISBN:


Download CONSTRUCTION DESIGN OF EBR-II Book in PDF, Epub and Kindle

The Argoune Experimentul Breeder Reactor-II is a completely integrated nuclear power plant which employs an unmoderated reactor as a heat source, and generates 20,000 kw of electricity. The integrated nuclear plant includes the fuel re-processing and fabrication cycle and thereby makes a signigicant contribution to power reactor techaology by operating on recycled fuel. The preliminary design of this plant was described at the First International Conference on the Peaceful Uses of Atomic Energy in 1955. Although the basic design concept and objectives have remained unchanged, many modiflcations have been made in the detailed design, including separation of the facility into several plants and providing containment for the reaetor system. The plant capacity and basic power cycle have rematned essentially unchanged: 62.5 Mw thermal, 900F reactor sodium outlet temperature, and 1250-psig steam at 850F at the turbine throttle. The feed-water te mperature, however, has been increased to 550F to reduce thermal stresses in the steam generator. (auth).


CONSTRUCTION DESIGN OF EBR-II
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1958 - Publisher:

GET EBOOK

The Argoune Experimentul Breeder Reactor-II is a completely integrated nuclear power plant which employs an unmoderated reactor as a heat source, and generates
Experimental Breeder Reactor-II (EBR-II)
Language: en
Pages: 264
Authors: Leonard J. Koch
Categories: Technology & Engineering
Type: BOOK - Published: 2008 - Publisher:

GET EBOOK

Koch, former manager of the Experimental Breeder Reactor-II (EBR-II), offers a first-hand account of the development, design, construction, and initial operatio
The Design and Construction of the EBR-II Initial Fuel Loading Facility
Language: en
Pages: 50
Authors: James E. Ayer
Categories: Nuclear power plants
Type: BOOK - Published: 1961 - Publisher:

GET EBOOK

The need for the first core for EBR-II resulted in the design and construction of the Initial Fuel Loading Facility for this reactor. The plant was built to pro
The Design and Construction of the EBR-II Initial Fuel Loading Facility
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1961 - Publisher:

GET EBOOK

The need for the first core for EBR-11 resulted in the design and construction of the Initial Fuel Loading Facility for this reactor. The plant was built to pro
Design, Analysis, and Construction of EBR-II Primary Tank and Associated Structures
Language: en
Pages: 0
Authors: R. W. Seidensticker
Categories: Breeder reactors
Type: BOOK - Published: 1970 - Publisher:

GET EBOOK

The entire EBR-II primary coolant system and fuel-handling system are submerged in about 80,000 gallons of sodium at 700 degrees F, all contained in a large dou