Limited Production (LP) Precision Runway Monitor (PRM) Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Plan

Limited Production (LP) Precision Runway Monitor (PRM) Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Plan
Author:
Publisher:
Total Pages: 36
Release: 1995
Genre:
ISBN:


Download Limited Production (LP) Precision Runway Monitor (PRM) Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Plan Book in PDF, Epub and Kindle

This document defines the Test Plan and corresponding Test Verification Requirements Traceability Matrix (TVRTM) that will be used to conduct the Limited Production (LP) Precision Runway Monitor (PRM) Operational Test and Evaluation (OT & E) Integration and OT & E Operational tests. These tests will be conducted at the Minneapolis-St. Paul International Airport following the Contractor Site Acceptance Test. The LP PRM OT & E test effort will concentrate on Operational Effectiveness and Operational Suitability. The Operational Effectiveness Test consists of a review of the contractor performed Development Test and Evaluation (DT & E) and Site Acceptance Tests. This review will evaluate whether each of the Measures of Effectiveness had been satisfactorily tested and whether the results meet the Minimum Acceptable Operational Requirements (MAORs). This review will be conducted solely by test engineers and does not require the PRM system. The Operational Suitability Tests will expose the test participants (Air Traffic (AT) Controllers and Airway Facilities (AF) Technicians) to the PRM system in an operational environment while they perform specified operational procedures. These tests will be conducted in two separate phases: AT Suitability and AF Suitability. Each of these phases is focused on the specific test participants. (AN).


Limited Production (LP) Precision Runway Monitor (PRM) Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Plan
Language: en
Pages: 36
Authors:
Categories:
Type: BOOK - Published: 1995 - Publisher:

GET EBOOK

This document defines the Test Plan and corresponding Test Verification Requirements Traceability Matrix (TVRTM) that will be used to conduct the Limited Produc
Limited Production (LP) Precision Runway Monitor (PRM) Operational Test and Evaluation (OT & E) Integration and OT & E Operational Test Procedures
Language: en
Pages:
Upgrade Precision Runway Monitor (PRM) Operational Test And Evaluation (OT and E) Test Plan
Language: en
Pages: 43
Authors:
Categories:
Type: BOOK - Published: 1992 - Publisher:

GET EBOOK

This document defines the Upgrade Precision Runway Monitor (Upgrade PRM) Operational and Integration tests that will be conducted at the Federal Aviation Admini
Government Reports Announcements & Index
Language: en
Pages: 748
Authors:
Categories: Science
Type: BOOK - Published: 1996 - Publisher:

GET EBOOK

Limited Production Precision Runway Monitor (PRM) Master Test Plan
Language: en
Pages: 37
Authors:
Categories:
Type: BOOK - Published: 1992 - Publisher:

GET EBOOK

This Master Test Plan (MTP) establishes the basic framework to guide and direct the Limited Production (LP) Precision Runway Monitor (PRM) test program. This MT